Introduction
When businesses plan a move, the question that follows "how much" is "how long".
The honest answer is that construction is only one part of it. Design, approvals, procurement and handover all sit on the same timeline, and delays in any of them move your opening date.
Understanding each phase lets you plan backwards from the date you need the office ready, and decide early rather than late.
In This Guide
- Why the timeline is more than construction
- The phases of an office fit-out
- What affects duration
- Common causes of delay
- How to keep a programme on track
- Frequently asked questions
Why the Timeline Is More Than Construction
Many tenants ask for the construction duration and plan their move around it. The risk is that design, approvals and long-lead orders have to happen before any site work begins, and they can take as long as the build itself.
A reliable programme counts everything from the first brief to the day you are working in the space.
The Phases of an Office Fit-Out
1. Brief and site assessment
You define headcount, layout needs, meeting spaces, technology and budget. The site is surveyed for existing conditions, services and landlord requirements.
2. Design
Concept, space planning and detailed drawings are developed and agreed. The more complete the brief, the faster this stage moves.
3. Approvals
Landlord review, building management and authority submissions are made as required. Timing depends on the building, the free zone and the quality of the submission.
4. Procurement
Materials and equipment are ordered. Some items, such as specialist glazing, joinery, lighting and AV equipment, may take longer to arrive than others.
5. Construction
Site works include partitions, ceilings, services, flooring, joinery and finishes. Mechanical, electrical and plumbing works are coordinated with the building's services.
6. Testing and commissioning
Systems such as air conditioning, fire and life safety, power and data are tested and signed off.
7. Snagging and handover
Defects are identified and resolved, the space is cleaned, and the documents, warranties and keys are handed over.
What Affects Duration
- Size and complexity: larger floors and more varied spaces take longer.
- Cat A and Cat B: a space that needs both stages requires more work than one that needs only Cat B.
- Specification: custom joinery and specialist finishes extend procurement and installation.
- Building rules: working hours, delivery windows and access restrictions can limit progress.
- Decision speed: timely sign-offs keep each phase moving.
As a general principle, a small, simple office can be fitted out far faster than a large, bespoke one. Ask for a programme based on your actual scope rather than a rule of thumb.
Common Causes of Delay
Late design changes
Changing layouts or finishes after approval often means resubmission and reordering.
Approval cycles
Incomplete submissions or drawing revisions add rounds of review.
Long-lead items
Custom or imported items that are ordered late hold up installation.
Coordination gaps
When design, approvals and construction are managed separately, handovers between them cost time.
Unforeseen site conditions
Existing services or structures that differ from the drawings can require redesign.
How to Keep a Programme on Track
- start from the date you need to open and work backwards
- finalise the brief before design begins
- submit complete documents the first time
- order long-lead items as early as the design allows
- agree a decision schedule so approvals are not waiting on you
- use one team for design, approvals and construction where possible
Frequently Asked Questions
How long does an office fit-out take?
It depends on size, scope and approvals. A small, simple fit-out can take a matter of weeks, while larger or more bespoke projects take a few months. A realistic programme needs your actual scope.
When should I start planning?
Before you sign the lease, if possible, so the programme and landlord requirements are known up front.
Can the timeline be shortened?
Sometimes, through earlier decisions, simpler specification or overlapping phases, though compressing too far can raise cost and risk.
What if my lease starts before the office is ready?
Ask whether a rent-free fit-out period is available and plan the programme to use it.
Plan Your Move with a Realistic Programme
An office that opens on time starts with a programme built on real phases, not assumptions.
Swissly delivers turnkey interior fit-out in Dubai with design-to-delivery execution under one accountable team.